Design record completeness check

Thirteen inputs decide the construction, the wattage and the control configuration. A missing one does not stop the quotation — it becomes an assumption, and the assumption is carried by whoever approves the drawing.

Step 1 — Tick what you can supply today

The thirteen inputs

Tick the inputs you hold, then press the button.

How to read the result

  • Every unticked line is a figure someone has to choose for you before a price exists
  • An assumption written into a drawing becomes your commitment at drawing approval
  • Items 1 to 4 are usually settled by one annotated photograph plus a tape measure

Step 2 — Where a wrong input surfaces

Three gates and who carries the risk

GateWhat is decided thereWho carries it if it is wrong
Drawing approvalDimensions, cutouts, wattage basis and sensor positionYou. We build the approved revision, so a dimension supplied wrong is a re-make at your cost
Prototype acceptanceFit on the actual item, connector orientation and the agreed fit checksShared. Fit findings at this gate are corrected at our cost; new requirements introduced here are a revision
Production releaseThe frozen configuration for the ordered quantityUs. Units that differ from the released configuration are our re-make

Lead time is counted from drawing approval, not from the enquiry. Inputs that arrive after approval restart the drawing, not the build queue.

Next step

Send the record you have, with an annotated photo for the dimensions — we will tell you which of the remaining items we can assume safely and which one has to come from you.